Lesson 2.11
Chapter Check
01 · start here m25 12 ft bitumen sheet aac wpc ss box 02 · the common misunderstanding knowing the product name is not the same as understanding the specification.
You do not need to remember every specification. You need to know what the words mean and when to ask for more detail.
01 · Start Here
- M25
- 12 ft
- Bitumen sheet
- AAC
- WPC
- SS Box
02 · The Common Misunderstanding
Knowing the product name is not the same as understanding the specification.

03 · What the Terms Mean
What grade is specified, and who selected it?
Is the number floor-to-floor or clear finished height?
What exact system is used, and where?
What material is supplied, and what changes with it?
What demand and backup period produced the capacity?
What exact material is being used at each location?
05 · What to Watch
If a contractor substitutes a lower specification, do not argue from the word 'premium'. Ask what changed, where it is being used and whether the designer has approved it.
Ask Before You Approve It
- What exactly is being supplied?
- Why is it appropriate here?
- What changes if this is substituted later?
Check Your Understanding
A quotation says only 'Premium Waterproofing'. What is the most useful next question?
- Which exact product/system is used, and where?
- What colour is the waterproofing?
- Is it the most expensive option?
Correct. A useful specification tells you the actual system and where it is being used.
Apply the idea
Classify what the specification term is telling you.
Complete the decision to finish this scene.