Lesson 5.1
Your Project File
01 start with one place start with one place do not scatter important information everywhere.
Your project file becomes the memory of the building.
Know what was built. Know that it works. Keep the information needed to look after it.
01 Start With One Place
Start With One Place
Do not scatter important information everywhere.

Your project records can be digital.
Physical.
Or preferably both.
Create clear folders such as:
The exact folder names do not matter.
The habit does.
If it affects what gets built, keep a copy.
02 Approved Drawings
Approved Drawings
Keep the final approved or sanctioned drawings applicable to your project.
These may include things such as:
- site plan
- floor plans
- elevations
- sections
- approval drawings
- other authority submissions where applicable.
The important distinction is:
DESIGN DRAWING
What someone proposed.
APPROVED DRAWING
What was formally approved where approval is required.
Do not assume the two are always identical.
03 Architectural Drawings
Architectural Drawings
These tell you how the building is arranged.
Keep the latest versions of:
- plans
- elevations
- sections
- door/window schedules where provided
- detail drawings
- room layouts
- important finish drawings.
Look for the revision.
If you have:
Revision 01
Revision 02
Revision 05
you should know which one was finally issued for construction.
The newest-looking PDF in your phone is not necessarily the drawing used on site.

04 Structural Drawings
Structural Drawings
Keep the structural information supplied for the project.
This may include:
- foundation drawings
- column layouts
- beam layouts
- slab drawings
- reinforcement details
- structural notes.
You may never personally calculate any of it.
That is fine.
The value is that the information remains available later if the building is:

modified
extended
investigated
repaired
05 Services Drawings
Services Drawings
Where provided, retain drawings or final information for:
These systems become difficult to understand once the building is finished.
Good records preserve that knowledge.
06 Contract & Scope
Contract & Scope
What exactly did each person agree to provide?
Keep the:
- signed contract
- quotation
- inclusions
- exclusions
- specification
- payment terms
- timeline
- warranty commitments.
This becomes particularly important when someone says:
“That wasn't included.”
Instead of arguing from memory, you can check the agreed scope.
07 Specifications
Specifications
A drawing might show a wall.
The specification tells you what that wall is made from.
A drawing might show flooring.
The specification tells you which material was intended.
Keep major decisions such as:
- concrete specification
- wall material
- waterproofing
- windows
- flooring
- electrical
- plumbing
- paint
- joinery
- fittings.
Drawing tells you where.
Specification tells you what.

You often need both.
08 Payment Records
Payment Records
Keep:
- invoices
- receipts
- milestone payments
- major purchase bills
- final settlement records.
This is not merely accounting.
Some warranties may depend on:
proof of purchase
or
installation date.
09 Contact List
Contact List
People become difficult to find several years later.
Save:
Architect
Structural Engineer
Contractor
Electrician
Plumber
Waterproofing Contractor
Window Supplier
Kitchen / Joinery Vendor
Automation Vendor
Pump Technician
along with:
company
phone
scope
Do it while everybody is still involved.
10 Check Your Understanding
Which record helps future alteration decisions?
You want to remove a wall. What is more useful?
Memory
Final architectural + structural records
Your project file becomes the memory of the building.
Ownership begins when the project information, controls and maintenance knowledge become yours.
Apply the idea
File each record where you can retrieve it later.
Complete the decision to finish this scene.