Chapter 5 · Lesson 5.2Document What Gets Hidden
0%

Lesson 5.2

Document What Gets Hidden

ch05-l02-img02 course image concealed floor, wall and ceiling systems should be photographed before each covering layer hides them.

Record what you will eventually stop being able to see.

Educational architectural illustration showing concealed floor, wall and ceiling systems should be photographed before each covering layer hides them
Concealed floor, wall and ceiling systems should be photographed before each covering layer hides them.

Know what was built. Know that it works. Keep the information needed to look after it.

01 Before Plaster

Before Plaster

Photograph walls while electrical and plumbing routes are visible.

Useful photographs may show:

  • conduit routes
  • electrical boxes
  • water lines
  • drainage
  • AC pipes
  • data cables.

Try to capture enough of the room that you can understand where the route is later.

A photograph showing only a pipe with no context is less useful.

Educational architectural illustration showing a useful concealed-work photograph includes the full wall, fixed reference points, route context and scale before plaster
A useful concealed-work photograph includes the full wall, fixed reference points, route context and scale before plaster.

02 Before Flooring

Before Flooring

Where relevant, record:

  • plumbing routes
  • floor services
  • waterproofing
  • drain positions
  • underground lines
  • tank work.

Once screed and flooring cover them, exact positions become harder to identify.

03 Before False Ceiling

Before False Ceiling

Photograph:

  • electrical routes
  • AC ducts
  • drain lines
  • automation modules
  • speakers
  • access zones
  • junction locations.

Photograph the ceiling before the ceiling disappears.

04 Waterproofing

Waterproofing

This deserves its own record.

Take photographs of important areas before tiling or backfilling:

  • bathrooms
  • balconies
  • terraces
  • tanks
  • below-ground work.

Where available, also retain:

  • product details
  • contractor information
  • warranty
  • testing records.

Years later, this can help identify what system exists under the finish.

05 Record Changes

Record Changes

The drawing is only useful if it still matches reality.

Imagine a plumbing line was shifted on site.

The original drawing still shows the old route.

If nobody records the change, the drawing becomes misleading.

So important changes should be reflected in:

  • marked-up drawings
  • revised drawings
  • written records
  • photographs.

06 Keep Approvals For Changes

Keep Approvals For Changes

Some changes affect:

price

design

performance

Before proceeding, record:

  • what changed
  • why
  • additional or reduced cost
  • who approved it.

This prevents:

“I thought that was included.”

and:

“Nobody told me it was changing.”

07 Product Information

Product Information

Save labels or photographs of major products where useful.

For example:

paint shade

tile code

laminate code

sanitaryware model

tap range

switch range

window system

hardware

You do not need a museum of packaging.

Just enough information to identify replacements later.

08 Name Your Files Properly

Name Your Files Properly

Instead of:

IMG_4837.jpg

use something like:

Master Bathroom - Plumbing Before Tiling - Aug 2026

Instead of:

drawing-final-final2.pdf

use:

First Floor Electrical - Rev 04 - Issued for Construction

Simple naming makes the archive far more useful.

09 The Concealed-Work Map

The Concealed-Work Map

A particularly useful end-of-project record can combine:

Educational architectural illustration showing a concealed-work map becomes useful when a photograph, location, dimensions, route description and date are tied together
A concealed-work map becomes useful when a photograph, location, dimensions, route description and date are tied together.

final drawing

-

photographs

-

notes

For example:

MASTER BEDROOM TV WALL

  • socket location
  • conduit route
  • data point
  • AC drain route
  • photograph before plaster.

You are effectively creating an X-ray of the house.

10 Check Your Understanding

What should be recorded before it disappears?

Five years later you want to drill for a cabinet. Which record is more useful?

Context photo of concealed routes

Finished-room photograph

Record what you will eventually stop being able to see.

Ownership begins when the project information, controls and maintenance knowledge become yours.

Apply the idea

Create a useful hidden-services record.

Complete the decision to finish this scene.

  1. Label the route and date
  2. Photograph before plaster or closure
  3. Store it with the final project file
  4. Include a fixed room reference